by Alan Stankevitz | May 2, 1999
1999 by Alan Stankevitz | Jan 26, 2017 Sorry for the delay in keeping you updated. Since April, things have been very busy. Tri-County power should have a temporary line brought in by the middle of May and I should also have a phone line installed. As far as the...
by Alan Stankevitz | Feb 14, 1999
1999 by Alan Stankevitz | Jan 26, 2017 Over the last number of months, there’s been a lot of thinking, dreaming and rethinking going on. As things look now, I’m leaning towards using Cliff Shockey’s method of building walls – two walls with...
by Alan Stankevitz | Oct 25, 1998
Good Times, Bad Times – Rubble Trench Part II What a difference a week can make. Russ called to let me know that he was out at our building site on Tuesday and completed the digging necessary to allow proper drainage of our rubble trench. Then on Friday, I...
by Alan Stankevitz | Oct 18, 1998
Good Times, Bad Times – Rubble Trench Part I From the start, there would be good times and bad times. This last week was one of those bad times. It all started out very promising but as you will read, things ended the week on a bad note. The goal this month was...
by Alan Stankevitz | Aug 12, 1998
Cabin Fever The original plan was to build a room inside of the pole barn to use as temporary living quarters while I build our cordwood home. After tent camping inside of the pole barn I came to the following conclusions: Pole barns are extremely noisy during...