Underfloor Plumbing

Before filling the trench or laying down the radiant floor tubing, the under-floor drains must be carefully placed. Much time was devoted to measuring and re-measuring the placement of the toilet, shower, vanity, washtubs and kitchen sink drains. There’s only...

Papercrete for Mortar?

Pondering the Potential Possibility of Papercrete Mortar During my visit to this year’s Midwest Renewable Energy Fair, I moseyed on over to Rob Roy’s booth to see what was new and interesting. Rob showed me a hunk of papercrete mortar that James Juczak...

Insulating the Sand Bed

Before pouring in the sand and laying down the tubing, the bottom and the sides of the trench need to be insulated. This prevents most of the heat from escaping into the ground and allowing the majority of the heat to finds its way into the house through the concrete...

Excavating for Sand Bed and Plumbing

IDig Memorial Day And that about sums up my Memorial Day weekend. I spent the weekend digging a trench inside of the house that will eventually be filled with sand and used to store heat from the solar heating system. You are probably asking yourself by now,...

A Visit by Cliff Shockey

This week was highlighted by a visit from Cliff Shockey. I first started talking to Cliff when I became interested in his double wall building technique. Cliff’s method prevents air infiltration and greatly enhances the wall’s R value by sandwiching...